Skip the wait line

Wait behind this line

Bureau Suite 1 / South Broadway / 507 lane

(507) 555-0158
Ferrule Fit Rochester, Minnesota

Work the lanes will pass

Dry-fit first. Finish second. Recut when the window still shows light.

If you cannot name whether the collar sits or shows, start in Lane 1. Polish waits until a pass exists.

Lane 1

Lane Dry-Fit

Forty minutes. Scoring clubs to the window. A written pass or fail. No glue.

Lane 2

Bureau Finish

Dry-fit plus seating and polish so the collar occupies the neck without daylight. Eighty-five minutes.

Lane 3

Collar Recut

Proud rings trimmed, thin rings rejected. Existing lane slips only.

Paper

Lane Gift

A laminated slip. The recipient still has to meet the window.